Cleanroom Integration
End-to-end electromechanical subsystem assembly, metrology sign-off, and fab-ready logistics.
DIVISION KEY PARAMETERS
- Tolerance
- ISO Class 5 · ±0.002 mm
- Qualification
- ISO 14644-1 Class 5 · ISO 9001
- Primary Plants
- Suwon Plant & Austin Integration Center
- Lead Time
- Kanban / Dock-to-Line Integration

01 // ENGINEERING BRIEF
Built for zero-compromise production reliability.
VEKTOR eliminates multi-tier supplier handoffs by housing precision machining, special processes, ISO Class 5 assembly, and final functional testing under one quality system. Our integration engineers build turnkey gas boxes, wafer-stage frames, and optical assemblies with full digital genealogy.
REPRESENTATIVE DELIVERABLES
- Turnkey gas delivery panels & orbital-welded manifolds
- Pre-aligned wafer transfer robots & kinematic bases
- Thermal-jacketed vacuum chambers with integrated harnesses
- Cleanroom-certified kitting, N₂ purging & shock-monitored crating
- Digital build-record genealogy (torque logs, leak traces, BOM)
02 // QUALIFIED MATERIALS & FINISHES
Supported alloys, tolerances & special processes.
Machined Metals + Elastomers
Kalrez / FFKM / Metal C-Seals
- Achievable Tolerance
- Controlled Compression
- Surface / Thermal Treatment
- Vacuum Bakeout & Residual Gas Analysis
Orbital-Welded 316L Tubing
SEMI F19 Electropolished
- Achievable Tolerance
- 100% Borescope Checked
- Surface / Thermal Treatment
- Argon-Purged Automated Weld + He Leak
Ceramic & Quartz Interfaces
Al₂O₃ / SiC / Fused Silica
- Achievable Tolerance
- ±0.003 mm Fit
- Surface / Thermal Treatment
- Particle-Free Kinematic Mounting
Cleanroom Cabling & Sensors
PTFE / Kapton UHV Rated
- Achievable Tolerance
- Hi-Pot & Continuity Tested
- Surface / Thermal Treatment
- UL / SEMI S2 Harness Compliance
03 // EQUIPMENT & SPINDLE FLEET
Dedicated division machinery specifications.
| Equipment Platform | Configuration | Max Envelope | Repeatability | Active Fleet |
|---|---|---|---|---|
| ISO Class 5 Modular Assembly Bays | HEPA/ULPA Laminar Flow | 4,200 m² Combined Area | ≤ 3,520 p/m³ @ 0.5µm | 14 Bays |
| Residual Gas Analyzers (RGA) | Quadrupole Mass Spec | 1–200 AMU Range | Sub-ppb Hydrocarbons | 6 Systems |
| Laser Tracker Alignment Cells | 6-DOF Interferometer | Up to 15 m Radius | ±10 µm Volumetric | 4 Trackers |
| Automated Orbital Welding Stations | Closed-Head Digital | 1/4" to 2" Tubing | 100% Weld Log Trace | 10 Heads |
04 // QUALITY RELEASE CHECKPOINTS
Four mandatory verification gates prior to release.
BOM Genealogy & Component Wash
MES Serialized Scan + Ultrasonic DI Rinse
Digital Torque & Alignment Capture
DC Transducer Drivers + Laser Tracker
Functional Vacuum, RGA & Electrical Test
Automated Pumpdown & Hi-Pot Sequence
Double-Bag N₂ Purge & Shock Crating
Cleanroom Heat Seal + Tilt/Impact Logger
TECHNICAL INTAKE // 48-HOUR DFM REVIEW
Ready to qualify your cleanroom assembly?
Upload your STEP solid and 2D GD&T print via our RFQ portal. Suwon Plant & Austin Integration Center engineering teams respond with full DFM analysis within 48 hours.