End-to-end electromechanical subsystem assembly, metrology sign-off, and fab-ready logistics.

DIVISION KEY PARAMETERS

Tolerance
ISO Class 5 · ±0.002 mm
Qualification
ISO 14644-1 Class 5 · ISO 9001
Primary Plants
Suwon Plant & Austin Integration Center
Lead Time
Kanban / Dock-to-Line Integration
Symmetrical ISO Class 5 automated cleanroom assembly corridor
DIV-CLN // PRODUCTION HARDWAREISO Class 5 · ±0.002 mm

01 // ENGINEERING BRIEF

Built for zero-compromise production reliability.

VEKTOR eliminates multi-tier supplier handoffs by housing precision machining, special processes, ISO Class 5 assembly, and final functional testing under one quality system. Our integration engineers build turnkey gas boxes, wafer-stage frames, and optical assemblies with full digital genealogy.

REPRESENTATIVE DELIVERABLES

  • Turnkey gas delivery panels & orbital-welded manifolds
  • Pre-aligned wafer transfer robots & kinematic bases
  • Thermal-jacketed vacuum chambers with integrated harnesses
  • Cleanroom-certified kitting, N₂ purging & shock-monitored crating
  • Digital build-record genealogy (torque logs, leak traces, BOM)

02 // QUALIFIED MATERIALS & FINISHES

Supported alloys, tolerances & special processes.

MAT-01

Machined Metals + Elastomers

Kalrez / FFKM / Metal C-Seals

Achievable Tolerance
Controlled Compression
Surface / Thermal Treatment
Vacuum Bakeout & Residual Gas Analysis
MAT-02

Orbital-Welded 316L Tubing

SEMI F19 Electropolished

Achievable Tolerance
100% Borescope Checked
Surface / Thermal Treatment
Argon-Purged Automated Weld + He Leak
MAT-03

Ceramic & Quartz Interfaces

Al₂O₃ / SiC / Fused Silica

Achievable Tolerance
±0.003 mm Fit
Surface / Thermal Treatment
Particle-Free Kinematic Mounting
MAT-04

Cleanroom Cabling & Sensors

PTFE / Kapton UHV Rated

Achievable Tolerance
Hi-Pot & Continuity Tested
Surface / Thermal Treatment
UL / SEMI S2 Harness Compliance

03 // EQUIPMENT & SPINDLE FLEET

Dedicated division machinery specifications.

ILLUSTRATIVE CAPACITY SCHEDULE
Equipment PlatformConfigurationMax EnvelopeRepeatabilityActive Fleet
ISO Class 5 Modular Assembly BaysHEPA/ULPA Laminar Flow4,200 m² Combined Area≤ 3,520 p/m³ @ 0.5µm14 Bays
Residual Gas Analyzers (RGA)Quadrupole Mass Spec1–200 AMU RangeSub-ppb Hydrocarbons6 Systems
Laser Tracker Alignment Cells6-DOF InterferometerUp to 15 m Radius±10 µm Volumetric4 Trackers
Automated Orbital Welding StationsClosed-Head Digital1/4" to 2" Tubing100% Weld Log Trace10 Heads

04 // QUALITY RELEASE CHECKPOINTS

Four mandatory verification gates prior to release.

GATE 01100% Clean-Verified Kit Entry

BOM Genealogy & Component Wash

MES Serialized Scan + Ultrasonic DI Rinse

GATE 02Every Fastener Logged to Serial Number

Digital Torque & Alignment Capture

DC Transducer Drivers + Laser Tracker

GATE 03Zero Virtual Leaks · Pass RGA Spectrum

Functional Vacuum, RGA & Electrical Test

Automated Pumpdown & Hi-Pot Sequence

GATE 04Direct Fab Dock-Ready Release

Double-Bag N₂ Purge & Shock Crating

Cleanroom Heat Seal + Tilt/Impact Logger

CAD-CMM // ISO 10360-2
MPE 0.6 + L/400 µm
290.000 ±0.005DATUM-A // BOREØ108.000 ±0.002 mmCONCENTRICITY 0.0015 | ASEAL SURFACE FINISHRa 0.20 µm MAXHELIUM LEAK < 1E-9 TORRCMM THERMAL LAB20.0 °C ± 0.2 °C1,440 PTS · CPK 1.84VEKTOR METROLOGYALLOY: 316L VIM-VARREV: D4-04UNIT: MMAPRIMARY FLATNESS DATUM · 0.003 MM TIR
DIV-CLN // GD&T DATUM & CMM PROBE PROTOCOLAS9102 / SEMI F20

TECHNICAL INTAKE // 48-HOUR DFM REVIEW

Ready to qualify your cleanroom assembly?

Upload your STEP solid and 2D GD&T print via our RFQ portal. Suwon Plant & Austin Integration Center engineering teams respond with full DFM analysis within 48 hours.