Skip to content
VEKTORPRECISION
01DIV-SEMI // PRECISION DIVISION

Semiconductor Subsystems

Ultra-high vacuum process chambers, load locks, and precision gas distribution hardware.

DIVISION KEY PARAMETERS

Tolerance
±0.002 mm
Qualification
ISO 14644-1 Class 5 · SEMI F20
Primary Plants
Suwon Plant & Austin Integration Center
Lead Time
3–5 Weeks Prototype / Kanban Series
Semiconductor vacuum chamber assemblies inside dark cleanroom production bay
DIV-SEMI // PRODUCTION HARDWARE±0.002 mm

01 // ENGINEERING BRIEF

Built for zero-compromise production reliability.

VEKTOR operates dedicated high-rigidity gantry machining bays paired directly with ultrasonic aqueous cleaning lines and ISO Class 5 assembly rooms in Suwon and Austin. From monolithic 6061-T651 etch chambers to electropolished 316L VIM-VAR gas boxes, every subsystem ships with full material certs, helium leak traces, and CMM balloon reports.

REPRESENTATIVE DELIVERABLES

  • Monolithic etch, CVD & PVD vacuum process chambers
  • Transfer modules, load-lock bodies & slit-valve housings
  • Brazed liquid-cooled electrostatic chuck bases
  • Electropolished 316L gas distribution manifolds & showerheads
  • Optical lithography metrology frames (Invar 36 & ceramic-bonded)

02 // QUALIFIED MATERIALS & FINISHES

Supported alloys, tolerances & special processes.

MAT-01

Al 6061-T651 / Al 5083

AMS-QQ-A-250 / Vacuum Plate

Achievable Tolerance
±0.002 mm
Surface / Thermal Treatment
Type III Hard Anodize / Y₂O₃ Ready
MAT-02

316L VIM-VAR Stainless

SEMI F20 Ultra-High Purity

Achievable Tolerance
±0.003 mm
Surface / Thermal Treatment
Electropolish Ra ≤ 0.15 µm + Passivation
MAT-03

Invar 36 (NiFe36)

ASTM F1684 Low CTE

Achievable Tolerance
±0.002 mm
Surface / Thermal Treatment
Multi-Stage Cryogenic Stress Relief
MAT-04

C10100 OFHC Copper

ASTM F68 Oxygen-Free

Achievable Tolerance
±0.004 mm
Surface / Thermal Treatment
Bright Acid Clean + Vacuum Bakeout

03 // EQUIPMENT & SPINDLE FLEET

Dedicated division machinery specifications.

ILLUSTRATIVE CAPACITY SCHEDULE
Equipment PlatformConfigurationMax EnvelopeRepeatabilityActive Fleet
5-Axis Gantry Machining CentersSimultaneous 5-Axis1,600 × 1,200 × 900 mm±0.002 mm44 Cells
High-Vacuum Brazing Furnaces10⁻⁶ Torr Thermal Zone1,100 × 900 × 800 mm±2 °C Uniformity6 Furnaces
Ultrasonic DI-Water Wash Lines8-Tank Automated1,500 × 1,000 × 800 mm18.2 MΩ·cm DI4 Lines
Helium Mass-Spec Leak StationsTurbo-Pumped Cart2,200 × 1,600 mm Bay1×10⁻⁹ atm·cc/s12 Stations

04 // QUALITY RELEASE CHECKPOINTS

Four mandatory verification gates prior to release.

GATE 01100% SEMI F20 / AMS Heat Match

Billet & Chemistry Verification

XRF Spectrometer & Mill Cert Audit

GATE 02Flatness ≤ 0.005 mm Across Seal Datum

In-Process Stress Relief & Probing

Spindle Laser Probe Between Rough & Finish

GATE 03Leak < 1×10⁻⁹ atm·cc/s · Zero Hydrocarbons

UHV Integrity & Particle Test

Helium Mass Spec + LPC Liquid Count

GATE 04AS9102 / Full Digital CMM Certificate

Cleanroom Double-Bag Release

ISO Class 5 N₂ Purge + Barcode Trace Pack

CAD-CMM // ISO 10360-2
MPE 0.6 + L/400 µm
290.000 ±0.005DATUM-A // BOREØ108.000 ±0.002 mmCONCENTRICITY 0.0015 | ASEAL SURFACE FINISHRa 0.20 µm MAXHELIUM LEAK < 1E-9 TORRCMM THERMAL LAB20.0 °C ± 0.2 °C1,440 PTS · CPK 1.84VEKTOR METROLOGYALLOY: 316L VIM-VARREV: D4-04UNIT: MMAPRIMARY FLATNESS DATUM · 0.003 MM TIR
DIV-SEMI // GD&T DATUM & CMM PROBE PROTOCOLAS9102 / SEMI F20

TECHNICAL INTAKE // 48-HOUR DFM REVIEW

Ready to qualify your semiconductor assembly?

Upload your STEP solid and 2D GD&T print via our RFQ portal. Suwon Plant & Austin Integration Center engineering teams respond with full DFM analysis within 48 hours.