Skip to content
VEKTORPRECISION
02GLOBAL MANUFACTURING NETWORK

Four synchronized smart plants on one digital thread.

67,800 m² of climate-controlled 5-axis machining bays, ISO 14644-1 Class 5 cleanroom integration wings, and dedicated bridge CMM metrology rooms across Europe, Asia-Pacific, and North America.

NETWORK FOOTPRINT

Combined Floor Area
67,800 m²
Cleanroom Wing
4,200 m² Class 5
Unified Backbone
ERP / MES / CMM Sync

01 // FILTERABLE CAMPUS DIRECTORY

Filter campuses by corridor or quality certification.

Region:
Standard:
SHOWING 4 OF 4 MANUFACTURING CAMPUSES
PLT-MUC-0148.1351° N, 11.5820° E

Munich, Germany

Europe

Global Engineering HQ & Aerospace / Robotics Hub

Floor Area
18,400 m²
Cleanroom Environment
ISO Class 7 Metrology & Assembly
Primary Equipment Fleet
64 × 5-Axis Simultaneous & Grinder Cells

Certifications

AS9100DIATF 16949ISO 9001:2015ISO 14001

munich.rfq@vektor-precision.example

CET / UTC+1 · +49 89 0100 4420

Route RFQ
PLT-SWN-0237.2636° N, 127.0286° E

Suwon, South Korea

Asia-Pacific

Semiconductor Vacuum Chamber & Class 5 Integration Center

Floor Area
22,000 m²
Cleanroom Environment
ISO 14644-1 Class 5 (4,200 m² Wing)
Primary Equipment Fleet
58 × Heavy Gantry 5-Axis & Brazing Furnaces

Certifications

ISO 14644-1 Class 5ISO 9001:2015ISO 14001SEMI F20

suwon.rfq@vektor-precision.example

KST / UTC+9 · +82 31 0100 8810

Route RFQ
PLT-AUS-0330.2672° N, 97.7431° W

Austin, United States

North America

North American Fab Integration & Aerospace Quick-Turn Plant

Floor Area
12,600 m²
Cleanroom Environment
ISO 14644-1 Class 5 / Class 6 Bays
Primary Equipment Fleet
34 × 5-Axis Mills & Cleanroom Test Rigs

Certifications

AS9100DISO 14644-1 Class 5ISO 9001:2015ITAR Ready

austin.rfq@vektor-precision.example

CST / UTC-6 · +1 512 010 3940

Route RFQ
PLT-PNG-045.2974° N, 100.2756° E

Penang, Malaysia

Asia-Pacific

High-Volume Lights-Out Robotic Actuator & Mill-Turn Campus

Floor Area
14,800 m²
Cleanroom Environment
ISO Class 7 Precision Assembly
Primary Equipment Fleet
42 × Palletized FMS & Mill-Turn Cells

Certifications

IATF 16949ISO 9001:2015ISO 14001

penang.rfq@vektor-precision.example

MYT / UTC+8 · +60 4 0100 7720

Route RFQ

02 // METROLOGY & CLEANROOM LABS

Thermal stability to 20.0 °C ± 0.2 °C across all inspection cells.

Every plant isolates its metrology laboratory on vibration-damped monolithic concrete slabs. Parts soak thermally prior to continuous 5-axis tactile CMM scanning, white-light profilometry, and helium mass-spectrometer leak testing.

CAD-CMM // ISO 10360-2
MPE 0.6 + L/400 µm
290.000 ±0.005DATUM-A // BOREØ108.000 ±0.002 mmCONCENTRICITY 0.0015 | ASEAL SURFACE FINISHRa 0.20 µm MAXHELIUM LEAK < 1E-9 TORRCMM THERMAL LAB20.0 °C ± 0.2 °C1,440 PTS · CPK 1.84VEKTOR METROLOGYALLOY: 316L VIM-VARREV: D4-04UNIT: MMAPRIMARY FLATNESS DATUM · 0.003 MM TIR
FIG 04 // CMM BRIDGE DATUM INSPECTION · 20.0 °C ± 0.2 °CAS9102 / SEMI F20
ISO 14644-1 CLASS 5 INTEGRATIONLAMINAR BAY
Automated ISO Class 5 semiconductor cleanroom assembly corridor

Bridge CMM Accuracy

0.6 + L/400 µm

Helium Leak Floor

< 1×10⁻⁹ atm·cc/s

Optical Roughness

Ra 0.02 µm Res

Trace Archive

15-Year Digital

TECHNICAL INTAKE // 48-HOUR DFM REVIEW

Schedule a virtual or on-site plant quality audit.

Our quality directors host customer AS9100D and semiconductor cleanroom qualification audits across Munich, Suwon, Austin, and Penang.